CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper
CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper
PLDZ-4728
In Stock
Buy and Download >
Description
CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper
http://issuu.com/lucky269/docs/uoptutorial.docx
CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper
Prepare a project requirements matrix, a risk assessment matrix, and a cost breakdown for the Learning Team project selected in Week 2. Microsoft® Excel can be used to prepare these documents.
Collect and evaluate the high-level project requirements.
Prepare a requirements matrix that includes:
Prepare a risk assessment matrix that includes:
- Potential of risk occurring
- Level of impact to the project
- How risk can be mitigated
Prepare the project cost breakdown sheet.
Click the Assignment Files tab to submit the requirements matrix, the risk assessment matrix, and the cost breakdown sheet.
CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper
http://issuu.com/lucky269/docs/uoptutorial.docx
CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper
Prepare a project requirements matrix, a risk assessment matrix, and a cost breakd