CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper

CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper PLDZ-4728
In Stock
$ 7.00 USD
Buy and Download   > Description

CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper

http://issuu.com/lucky269/docs/uoptutorial.docx

 

 

CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper

 

Prepare a project requirements matrix, a risk assessment matrix, and a cost breakdown for the Learning Team project selected in Week 2.  Microsoft® Excel can be used to prepare these documents.

Collect and evaluate the high-level project requirements.

Prepare a requirements matrix that includes:

 

 

 

    • Requirement

 

 

    • Phase of the Project

 

 

    • Responsible Party

 

 

    • Cost to complete

 

 

    • Duration to complete

 

 

 

Prepare a risk assessment matrix that includes:

 

 

 

    • Risk

 

 

    • Potential of risk occurring

 

 

    • Level of impact to the project

 

 

    • How risk can be mitigated

 

 

 

Prepare the project cost breakdown sheet.

Click the Assignment Files tab to submit the requirements matrix, the risk assessment matrix, and the cost breakdown sheet.

CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper http://issuu.com/lucky269/docs/uoptutorial.docx CPMGT 300 Week 3 Project Requirements/Risk/Cost Paper Prepare a project requirements matrix, a risk assessment matrix, and a cost breakd
Recent Reviews Write a Review
0 0 0 0 reviews