HCS 224 Week 3 Scheduling and Office Logistics Worksheet
HCS 224 Week 3 Scheduling and Office Logistics Worksheet
PLDZ-4150
In Stock
Buy and Download >
Description
HCS 224 Week 3 Scheduling and Office Logistics Worksheet
https://uopcourses.com/category/hcs-224/
HCS 224 Week 3 Scheduling and Office Logistics Worksheet
Resource: Scheduling and Office Logistics Worksheet and the Scheduling Matrix and Physician Schedule Spreadsheet
Complete Parts A, B, and C of the Scheduling and Logistics Worksheet.
Click the Assignment Files tab to submit your assignment.
Part A: Match the appropriate scheduling term to its definition.
1. |
_____ Wave Booking |
A. |
Booking together a number of patients who have specific needs at the same time of the day. |
2. |
_____ Modified Wave Booking
|
B. |
Also referred to as tidal wave scheduling; patients come in intermittently and are seen in the order they arrive. |
3. |
_____ Double Booking
|
C. |
Two patients are scheduled at the same time. |
4. |
_____ Stream/Time-Specified
scheduling
|
D. |
A grid with time slots blocked out when physicians are unavailable. |
5. |
_____ Open Booking
|
E. |
Patients are scheduled at the same time each hour to create short-term flexibility each hour. |
6. |
_____ Cluster Booking
|
F. |
Patients are scheduled for specific time intervals that are dependent on type of visit. |
7 |
_____ Matrix |
G. |
Scheduling two patients at one interval and one the next interval. Pattern is continued throughout the day. |
8. |
_____ Template |
H. |
A document with a preset format used as a starting point so it does not have to be recreated each time. |
Part B: Open and review the Scheduling Matrix and Physician Schedule Microsoft® Excel® spreadsheet. You will find the Scheduling Matrix located in the first sheet and the Physician Schedule located in the second sheet.
HCS 224 Week 3 Scheduling and Office Logistics Worksheet
https://uopcourses.com/category/hcs-224/
HCS 224 Week 3 Scheduling and Office Logistics Worksheet
Resource: Scheduling and Office Logistics Worksheet and the Scheduling Matrix and Ph