NTC 406 Entire Course | eBooks | Education

NTC 406 Entire Course

NTC 406 Entire Course PLDZ-5477
In Stock
$ 39.99 USD
UopTutorialStore
Buy and Download   > Description

NTC 406 Entire Course

https://zh.scribd.com/document/343514565/Uop-Tutorial

NTC 406 Week 2 Learning Team: Generic Manufacturing Company Project, Part I: WAN Assessment

 

Refer to the Project Overview and the attached documents provided in Week One.

Your team, working directly with the CIO of Generic Manufacturing Company, will conduct an in depth analysis of the Wide Area Network utilized by Generic Manufacturing Company and all of their plant locations. Your manager has requested you create a presentation which will be used to present to the executive committee and CIO who are not very technical.

Using Service Request 01 in the documents you downloaded in Week One, provide a WAN Assessment for Generic Manufacturing Company.

Create a 4- to 6-slide Microsoft® PowerPoint® WAN Assessment presentation including the following:

 

 

 

    • Outline of all the WAN components and their connectivity, including an inventory of all equipment and connectivity by location, as well as a survey of network applications running over the network

 

 

    • Videos, audio, photos, diagrams, or graphs as appropriate

 

 

    • Substantial speaker notes to elaborate on the key points of your plan, or insert audio narration into your presentation

 

 

 

Submit your assignment using the Assignment Files tab.

 

 

 

 

 

 

 

NTC 406 Week 2 Individual: TCP/IP Network

 

Your manager has tasked you with creating a Remote Employee Connection guide for IT. This guide will assist IT in setting up remote (work-from-home) employees to access the company’s Intranet. These employees will use a VPN connection from their PC in home to a remote VPN server located in the employee’s work campus.

Create a 2- to 3-page guide using Visio® including the following:

 

 

 

    • WAN access options from the home to an ISP

 

 

    • WAN access options from the work campus to another ISP (assuming a different ISP is used)

 

 

    • An end-to-end (from PC to VPN server) network diagram showing routers, switches, hosts and connections. Show on the diagram your choice of one of options considered; i.e., WAN access from home, or WAN access from work.

 

 

    • Major TCP/IP protocols with which the home PC is involved, from the moment it boots up until its first IPv4 packet reaches the VPN server.

 

 

    • Illustration of how the first IPv4 is forwarded through the network, showing:

       

       

       

       

        • Source and destination IPv4 addresses

       

       

        • Source and destination MAC addresses for the initial 2 hops in the header of the packet

       

       

        • Entries in the routers’ forwarding tables

       

       

       

       

 

 

    • Major routing protocols involved in building the forwarding tables

 

 

    • Repeat the last two items in the case of IPv6

 

 

 

Note: It is recommended that Visio® be used to create network diagrams for the presentation.

Copy and paste your network diagrams into Microsoft® Word.

Submit your assignment using the Assignment Files tab. Do not submit Visio® files.

 

 

 

 

 

 

 

NTC 406 Week 3 Learning Team: Generic Manufacturing Company Project, Part II: Troubleshooting FAQ

 

Refer to the Project Overview and the attached documents provided in Week One.

Identify and mitigate WAN network issues for Generic Manufacturing Company using Service Request 02 – Legacy Problems.

Building on the WAN analysis you conducted in Week Two for Generic Manufacturing Company, your team will identify potential problems and propose possible solutions.

Create a 1-page Troubleshooting FAQ document using Microsoft® Word that will be presented to the executive committee and CIO who are not very technical. Include the following:

 

 

 

    • Potential problems in terms of outdated technologies, Quality of Service (QoS), performance, and other areas identified in your assessment

 

 

  • Solutions proposed
NTC 406 Entire Course https://zh.scribd.com/document/343514565/Uop-Tutorial NTC 406 Week 2 Learning Team: Generic Manufacturing Company Project, Part I: WAN Assessment Refer to the Project Overview and the attached documents provided in Week On
Recent Reviews Write a Review
0 0 0 0 reviews