SEC410 Week Two Individual Perimeter Protection Case Study | Documents and Forms | Research Papers

SEC410 Week Two Individual Perimeter Protection Case Study

SEC410 Week Two Individual Perimeter Protection Case Study BA-587 Instant Download Price
In Stock
$ 5.99 USD
Quality Academic Papers
Buy and Download Description

As the security manager of the large, upscale waterfront 125-unit, 10-story condominium building complex known as Palm Beach Marina Cove (PBMC), you are advised that an expansion will take place with the launch of Palm Beach Marina Cove Building Two (PBMC II). PBMC II will be built in the lot contiguous to PBMC, which is directly east of the property near the intracoastal waterway seawall. The PBMC condominium association has directed you to draw up a perimeter protection plan that describes the latest best practices in perimeter protection for construction sites that integrate with the contiguous existing building. Write a 1,400- to 1,750-word paper proposing a perimeter protection plan for the PBMC condominium association. Include the following in your paper: · Recommendations based on best practices in perimeter protection for a construction site that integrates with the contiguous existing building · Options to consider to properly safeguard the perimeter of both sites during construction · Rationale for your recommendations · An estimated budget associated with your recommendations

As the security manager of the large, upscale waterfront 125-unit, 10-story condominium building complex known as Palm Beach Marina Cove (PBMC), you are advised that an expansion will take place with the launch of Palm Beach Marina Cove Building Two
Recent Reviews Be the first to Review this product!
0 0 0 0 reviews